top of page
IMG_4719.JPG

Cordes Geo-environmental Ltd Welcomes You

Waste Management Solution and Site Investigations in the United Kingdom, SE Asia and the Middle East

Contact
Untitled

Environmental and Waste Management Consulting Services

CGE Ltd offers a both a Site Investigations service and a Waste Management and Recycling service including plastic oil/energy  pyrolysis and plasterboard recycling equipment.

We carry out project inspection and monitoring in the United Kingdom and internationally especially the Middle East and SE Asia. We provide all aspects of Phase 1-4 SI from greenfield to complex contaminated sites from landfills, large scale housing to urban petrol station redevelopments including community and local authority interaction.

Contact
Home: About Me

Services

Expertise. Intuition. Ingenuity. Collaboration.

Home: Services

Plastic to Oil Pyrolysis Equipment

CGE Ltd are agents for Biofabrik who manufacture plastic to oil/energy pyrolysis equipment in Dresden, Germany

WASTX-Plastic-1.jpeg

Recycling and Management of Waste

CGE Ltd provide be-spoke recycling options for your waste from business to industrial and construction with the recycling of all types of plasterboard a specialty in co-operation with Eco Avant-garde srl, Italian manufacturers of plasterboard recycling and environmental energy equipment.

LOGO.png

Phase 1 - 4 SI Investigations from Desk Top to Validation 

Services are customised to meet the specific needs of each client in order to conform to the regulatory requirements. As such CGE Ltd works collaboratively throughout the entire process to achieve regulatory sign-off. All aspects of site clearance and asbestos removal can be undertaken prior to any intrusive trial pitting and drilling SI works. Contact us to find out how CGE Ltd can help.

Site Surveys

Initial walkover surveys prior to purchase to gauge on the ground issues on and near a proposed site and development that may not be apparent from the desk top study.

Phase 2 Investigations

CGE Ltd provide Phase 2 Site Investigations outlined in the Phase 1 report.
All aspects of site clearance and asbestos removal can be undertaken prior to any intrusive trial pitting and drilling SI works.

Phase 1 - 4 SI Investigations from Initial Desk Top Risk Assessment, SI Works, Remediation to Final Validation

Services are customised to meet the specific needs of each client in order to conform to the regulatory requirements. As such CGE Ltd works collaboratively throughout the entire process to achieve regulatory sign-off. All aspects of site clearance and asbestos removal can be undertaken prior to any intrusive SI works. Contact us to find out how CGE Ltd can help.

Permeability Tests

Soakaways may be required on a site and various in-situ permeability tests can be used in boreholes or standpipe piezometers and involve variable or constant head procedures.

Sign-off Services - Gas Membrane and Soils

CGE Ltd provide the following inspection and sign-off services: - Gas membranes - Topsoil and subsoil site import certification.

Landfill Location and Waste Transfer Station Services

CGE Ltd provides complete waste management facilities services, including recycling options for developing SE Asian and Middle East countries.

Contact

Contact to discuss your project requirements.

35 Gaze Hill Avenue, Sittingbourne ME10 4SH, UK

07388 803461

  • linkedin

Thanks for submitting!

Home: Contact
bottom of page